BCD Resources NL (Operations) Tasmania Mine Decommissioning and Rehabilitation Plan dated 20 April 2012
This fact sheet outlines how to design service trenches and stockpiles to prevent them eroding.
This fact sheet outlines how to prepare a Soil and Water Management Plan.
This fact sheet outlines planning measures to maintain existing vegetation to minimise erosion from building sites.
This fact sheet outlines how to manage dispersive soils to prevent tunnel or gully erosion.
This fact sheet outlines design considerations to minimise soil disturbance.
This fact sheet outlines methods for diverting up-slope runoff away from building sites to minimise erosion.
This fact sheet outlines how and where erosion mats and blankets are best used on building sites.
This fact sheet outlines measures to reduce the velocity of stormwater flow.
This fact sheet outlines measures to install a stabilised access point to provide a clean, dry surface to enter and unload during all weather conditions.