This application was withdrawn and has been superseded by a new application which is available at: Stornoway Raeburn Quarry Expansion August 2010
The Proposal
Public Exhibition of Documentation and Public Representations
Development Proposal and Environmental Management Plan
Environmental Assessment Report and EPA Decision
For Further Information
The Proposal
Stornoway Quarrying proposed to expand production at their existing Raeburn Quarry, located off Hobart Road Breadalbane, to 200,000 cubic
metres of gravel per annum. The proposal included a batching plant to produce 20,000 cubic metres of concrete per annum, and recycling of up
to 10,000 cubic metres of building materials per annum.
The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).
The proponent lodged a Development Application with a supporting Development Proposal and Environmental Management Plan (DPEMP) to the
Northern Midlands Council.
The DPEMP was prepared by the proponent on the basis of the project specific guidelines for preparation of a DPEMP which were provided by
the Board.
Public Exhibition of Documentation and Public Representations
A copy of the permit application, and of all plans and other documentation submitted with the permit application (including the
DPEMP) were advertised for public comment. The public comment period is now closed.
Following the public comment period the proponent was required by the Board, to prepare a DPEMP Supplement to address issues raised in public
and Government Agency consultation.
Development Proposal and Environmental Management Plan
Stornoway Quarrying - Raeburn Quarry Expansion - DPEMP (8Mb)
Stornoway - Appendix A - DPEMP Guidelines (219Kb)
Stornoway - Appendix B - Quarry Code of Practice (1Mb)
Stornoway - Appendix C - Traffic Assessment (1Mb)
Stornoway - Appendix D - Stornoway Policies (355Kb)
Stornoway - Appendix E - LMRS Soils and Rehabilitation Report (953Kb)
Stornoway - Appendix F - PC and Weeds (607Kb)
Stornoway - Appendix G - Aboriginal Sites Survey (608Kb)
Stornoway - Appendix H - Blasting Report (3Mb)
Stornoway - Appendix I - Noise Report (767Kb)
Stornoway - Appendix J - Washdown Guidelines (193Kb)
Stornoway Quarrying - Raeburn Quarry - DPEMP Supplement (3Mb)
Environmental Assessment Report and EPA decision
The environmental assessment report has now been completed and can be viewed below. This report contains an environmental assessment and
recommendations to the Board in relation to the proposal.
The permit conditions required by the Board to be included in the land use permit, if a permit is granted by Northern Midlands Council,
are contained in Appendix 3 of the environmental assessment report.
Stornoway Quarrying - Raeburn Quarry - EAR (3Mb)