Current Stage
Assessment Commenced
Proposal Details
Client: AK Saltwood Pty Ltd
Premises: Saltwood Sand Recovery Project
Activity: a quarry and materials handling
Class of Assessment: 2B
Important Dates
Assessment Commenced: 28/8/2024
The Proposal
The proposal is to recommence and intensify operations at the Saltwood Sand Recovery Project, with extraction limits of 150 000 metres cube per annum proposed. Raw sand is to be extracted from the dune facies, where it will be transported to a storage and screening area via internal access roads. The proposal is located approximately six kilometres east of Bellingham and nine kilometres west of Bridport.
Notice of Intent
AK Saltwood Pty Ltd, Saltwood Sand Recovery Project, Bridport - NOI (PDF 3Mb)
Environmental
Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist
the proponent to prepare a case for assessment. Based on the information
contained in the Notice of Intent, the guidelines identify the key issues which
are expected to be relevant to the assessment of the proposal.
AK Saltwood Pty Ltd, Saltwood Sand Recovery Project, Bridport - EER Guidelines (PDF 598Kb)