Current Stage
Assessment Commenced
Proposal Details
Client: Alcore Limited
Premises: Aluminium Smelter Bath Waste Recycling Pilot Plant
Activity: Chemical Works Facility
Class of Assessment: 2B
Important Dates
Assessment Commenced: 21/2/2025
The Proposal
Proposal is to construct and operate a pilot facility to recycle aluminium bath waste to produce aqueous hydrogen fluoride (for reuse in the aluminium smelting process) and metal sulfate by-products. The facility will have a total processing capacity of up to 220 tonnes per annum.
Notice of Intent
Alcore Limited, Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell Bay - NOI (PDF 2Mb)
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
Alcore Limited, Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell Bay - EER Guidelines (PDF 405Kb)