Alcore Limited, Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell Bay

Current Stage

Assessment Commenced

Proposal Details

Client: Alcore Limited

Premises: Aluminium Smelter Bath Waste Recycling Pilot Plant

Activity: Chemical Works Facility

Class of Assessment: 2B

Important Dates

Assessment Commenced: 21/2/2025

​The Proposal

Proposal is to construct and operate a pilot facility to recycle aluminium bath waste to produce aqueous hydrogen fluoride (for reuse in the aluminium smelting process) and metal sulfate by-products. The facility will have a total processing capacity of up to 220 tonnes per annum.

Notice of Intent

 Alcore Limited, Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell Bay - NOI (PDF 2Mb)


Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.​

 Alcore Limited, Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell Bay - EER Guidelines (PDF 405Kb)​