Current Stage
Assessment Commenced
Proposal Details
Client: BG & JM Barwick Pty Ltd
Premises: Barwicks In-vessel Compising Facility
Activity: Composting Facility
Class of Assessment: 2B
Important Dates
Assessment Commenced: 13/9/2022
The Proposal
The proposal involves the construction and
operation of an in-vessel composting facility, producing up to 14,500 tonnes of
compost product per year. The proposal composts within a closed loop system and
includes a negative pressure facility that captures and treats (through a
biofilter) odour produced from the composting process.
Notice of Intent
BG & JM Barwick Pty Ltd, In-vessel Composting Facility, Boyer - NOI (PDF 2Mb)
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
BG & JM Barwick Pty Ltd, In-vessel Composting Facility, Boyer - EER Guidelines (PDF 394Kb)