Current Stage
Assessment Completed
Proposal Details
Client: Bluestone Mines Tasmania Joint Venture Pty Ltd
Premises: Renison Bell Mine
Activity: a high voltage transmission line
Class of Assessment: 2A
Important Dates
Assessment Commenced: 5/8/2022
Assessment Completed: 19/9/2022
Page Content
Status: The proponent
withdrew the proposal on 19/09/2022.
The Proposal
Bluestone
Mines Tasmania Joint Venture Pty Ltd propose to construct and operate overhead
high voltage power lines and associated infrastructure at the existing Renison
Tailings Retreatment (Rentails) site at Renison Bell.