Current Stage
Assessment Commenced
Proposal Details
Client: Boral Construction Materials Group Ltd
Premises: Bridgewater Quarry
Activity: Material Recycling Facility
Class of Assessment: 2B
Important Dates
Assessment Commenced: 14/1/2026
The Proposal
Boral Construction Materials Group Ltd proposes to
develop a Material Recycling Facility at the existing Bridgewater Quarry to import
and process up to 50,000 tonnes of inert material such as glass, bricks and
construction and demolition waste. Processing will include screening, crushing,
sorting, and stockpiling using existing machinery. Finished recycled aggregates
from this proposal will be integrated (blended) directly into the quarry’s
existing production streams (e.g. road base, fill, or aggregate blend
components).
Notice of Intent
Boral Construction Materials Group Ltd, Bridgewater Quarry, Materials Recycling Facility, Bridgewater - NOI (PDF 4Mb)