Bridgewater Sandy Quarry, Bridgewater

Current Stage

Assessment Withdrawn

Proposal Details

Client: Boral Construction Materials Group Limited

Premises: 314 Midland Highway, Bridgewater 7030

Activity: Sand extractive pit

Class of Assessment: 2B

Important Dates

Assessment Commenced: 10/12/2018

Assessment Withdrawn: 30/10/2023

Status: The proponent withdrew the proposal on 30/10/2023.

​The Proposal

Boral Construction Group proposes to extract and screen up to 15,000 cubic metres of sand per year, within an existing mining lease at Bridgewater.​​