Concept Tree Services, Cranston Parade Mulching and Composting Facility, Cambridge

Current Stage

Assessment Commenced

Proposal Details

Client: Tree Concepts Pty Ltd

Premises: Cranston Parade Mulching and Composting Facility

Activity: Resource Recovery Facility

Class of Assessment: 2B

Important Dates

Assessment Commenced: 3/2/2025

The Proposal

Concept Tree Services propose to construct and operate a facility to process up to 20,000m3 of green waste annual into both mulch and compost. The facility will produce up to 5,000 tonnes of compost material per annum for sale for horticultural, commercial or agricultural industry use.​​

Notice of Intent

 Concept Tree Services, Cranston Parade Mulching and Composting Facility, Cambridge - NOI (PDF 3Mb)

Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Concept Tree Services, Cranston Parade Mulching and Composting Facility, Cambridge - EER Guidelines (PDF 673Kb)​