Copping Refuse Disposal Site Joint Authority, Copping Regional Organics Facility, Copping

Current Stage

Assessment Withdrawn

Proposal Details

Client: Copping Refuse Disposal Site Joint Authority

Premises: Copping Regional Waste Depot

Activity: organics treatment facility

Class of Assessment: 2B

Important Dates

Assessment Commenced: 18/6/2024

Assessment Withdrawn: 12/8/2025

The Pro​posal

The proposal is for an organics treatment facility adjacent to the existing Copping Landfill for the processing of up to 30,000 tonnes of food organics and garden organics (FOGO) from municipal collections. Other organic wastes may also be composted. Three composting options are being considered including in-vessel composting, anaerobic digestion methods and open windrow composting, with in-vessel composting proposed as the main system. It is proposed to utilise the methane gas generated from the anaerobic digestion system to contribute fuel to the existing (or new) generator and feed into the existing electrical network at the adjacent landfill site.​​

Notice of Intent 

 Copping Refuse Disposal Site Joint Authority, Copping Regional Organics Facility - NOI (PDF 6Mb)

Environmental Impact Statement Guidelines

EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Copping Refuse Disposal Site Joint Authority, Copping Regional Organics Facility - EIS Guidelines (PDF 623Kb)​