Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania

Current Stage

Assessment Completed

Proposal Details

Client: Forico Pty Ltd

Premises: Forico Plantation Sawmill

Activity: a wood processing works

Class of Assessment: 2A

Important Dates

Assessment Commenced: 2/12/2025

Case for Assessment Opened for Public Comment: 16/9/2026

Case for Assessment Closed for Public Comment: 30/9/2026

Assessment Completed: 10/11/2026

​​​​The Proposal

Forico Pty Ltd propose modifying an existing woodchip mill activity at Surrey Hills, Hampshire, to include a sawmill on the same site. The sawmill will have a maximum production log capacity of 240,000 m3 per annum using timber diverted from the woodchip mill activity. The Surrey Hills site is located within Forico plantations and the woodchip mill and sawmill will share existing infrastructure, including the stormwater management system and waste stockpiles.​​

The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Burnie Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).​

Notice of Intent 

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - NOI (PDF 4Mb)​

Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - EER Guidelines (PDF 412Kb)​

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed.

​Environmental Effects Report

The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.​​

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - EER (PDF 20Mb)

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix A1 Concept Plans Sawmill (PDF 52Mb)

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix A2 Concept Plans Log Storage Area (PDF 9Mb)

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix B Confirmation of planning permit requirement (PDF 270Kb)

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix C Preliminary Site Investigation (PDF 14Mb)

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix D Stormwater Balance Assessment (PDF 103Mb)​

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix E Noise Impact Assessment (PDF 111Mb)

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - Appendix F Natural Values Atlas Report (PDF 2Mb)

Environmental Assessment Report and EPA Decision

The environmental assessment report (EAR) has now been completed and can be viewed below. The report contains the permit conditions required by the Board to be included in the land use permit, if a permit is granted, by Council.

 Forico Pty Ltd, Plantation Sawmill, Surrey Hills, Hampshire, Tasmania - EAR (PDF 3Mb)​

EPA Decision​

EPA considers proposal for Plantation Sawmill, Surrey Hills, Hampshire ​