Goshawk Mining Pty Ltd, South Mount Cameron Operations Intensification

Current Stage

Assessment Commenced

Proposal Details

Client: Goshawk Mining Pty Ltd

Premises: South Mount Cameron Operations

Activity: quarry and materials handling

Class of Assessment: 2B

Important Dates

Assessment Commenced: 19/8/2024

​The Proposal

Goshawk Mining Pty Ltd is proposing to intensify the operations at the South Mount Cameron Tin Mine. The mine excavates and processes source gravel to produce tin ore (cassiterite), shingles and sand. Annual extraction and processing limits have varied between 20 000 to 75 000 cubic metres per annum since operations began in 2007, with new extraction and processing limits of 200 000 cubic metres per annum proposed. ​​

Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Goshawk Mining Pty Ltd, South Mount Cameron Operations Intensification - EER Guidelines (PDF 484Kb)