Greenham Tasmania Pty Ltd, Greenham Smithton Facility Upgrade, Smithton Abattoir

Current Stage

Public Comment Closed on Case for Assessment

Proposal Details

Client: Greenham Tasmania Pty Ltd

Premises: Smithton Abattoir

Activity: an abattoir

Class of Assessment: 2A

Important Dates

Assessment Commenced: 14/3/2025

Case for Assessment Opened for Public Comment: 10/10/2026

Case for Assessment Closed for Public Comment: 26/10/2026

​​​​The Proposal

Greenham Tasmania Pty Ltd is proposing to construct replacement operational facilities and demolish redundant infrastructure at the Smithton Abattoir, located off the Bass Highway, approximately 1.5km south of Smithton. There is no change in production volumes proposed.​​

The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Circular Head Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).​

​Notice of Intent

 Greenham Tasmania Pty Ltd, Greenham Smithton Facility Upgrade, Smithton Abattoir - NOI (PDF 353Kb)

 Greenham Tasmania Pty Ltd, Greenham Smithton Facility Upgrade, Smithton Abattoir - NOI Appendices (PDF 59Mb)​


Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Greenham Tasmania Pty Ltd, Greenham Smithton Facility Upgrade, Smithton Abattoir - EER Guidelines (PDF 399Kb)​

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed.

Environmental Effects Report

The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.

 Greenham Tasmania Pty Ltd, Greenham Smithton Facility Upgrade, Smithton Abattoir- EER (PDF 7Mb)​

 Greenham Tasmania Pty Ltd, Greenham Smithton Facility Upgrade, Smithton Abattoir - Appendices (PDF 51Mb)​