Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant, 1 Crooked Billet Drive B'water

Current Stage

Public Comment Closed on Case for Assessment

Proposal Details

Client: Hazell Bros Group Pty Ltd

Premises: Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant

Activity: Premix bitumen plant

Class of Assessment: 2B

Important Dates

Assessment Commenced: 31/5/2024

Case for Assessment Opened for Public Comment: 6/12/2025

Case for Assessment Closed for Public Comment: 15/1/2026

​​​​The Proposal

​Hazell Bros Group Pty Ltd are proposing to construct and operate a new asphalt and reclaimed asphalt pavement (RAP) processing plant within an industrial area of Bridgewater, producing a maximum of 50,000 tonnes per annum (tpa) of asphalt and receiving and processing up to 5,000 tpa of reclaimed asphalt pavement. ​

The proponent has lodged a Permit Application with a supporting Environmental Impact Statement (EIS) to Brighton Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).

Notice of Intent

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - NOI (PDF 735Kb)

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - Attachment 1 (PDF 351Kb)

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - Attachment 2 (PDF 285Kb)

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - Attachment 3 (PDF 946Kb)

Environmental Impact Statement Guidelines

EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - EIS Guidelines (PDF 572Kb)

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EIS) were made available for public inspection, the public inspection period has now closed.

Environmental Impact Statement

The purpose of the EIS is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EIS was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EIS which were provided by the Board.

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - EIS (PDF 10Mb)

 Hazell Bros Group Pty Ltd, Asphalt and Reclaimed Asphalt Pavement (RAP) Processing Plant - Appendices (PDF 45Mb)​