Hazell Bros Group Pty Ltd, Concrete Batch Plant, Leslie Vale

Current Stage

Assessment Commenced

Proposal Details

Client: Hazell Bros Group Pty Ltd

Premises: Conrete Batch Plant

Activity: concrete batching plant

Class of Assessment: 2A

Important Dates

Assessment Commenced: 29/10/2025

​​​​The Proposal

The proposal is to increase the operating hours for an existing concrete batch plant to 24 hours, 7 days a week (24/7). The concrete batch plant is located on the same land as the HBMI Quarry, an existing level 2 activity under Schedule 2 of EMPCA currently regulated by the EPA under Permit Conditions Environmental (PCE) No. 8593.

​Notice of Intent

 Hazell Bros Group Pty Ltd, Concrete Batching Plant, Leslie Vale - NOI (PDF 10Mb)​

​​Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal. 

 Hazell Bros Group Pty Ltd, Concrete Batching Plant, Leslie Vale - EER Guidelines (PDF 569Kb)​