Heidelberg Materials Australia Pty Ltd, Flagstaff Gully Quarry Production Increase, Lindisfarne

Current Stage

Assessment Commenced

Proposal Details

Client: Heidelberg Materials Australia Pty Ltd

Premises: Flagstaff Gully Quarry, Lindisfarne

Activity: a quarry

Class of Assessment: 2B

Important Dates

Assessment Commenced: 30/1/2026

​​The Proposal

Heidelberg Materials Australia Pty Ltd is proposing to increase production at the existing level 2 Flagstaff Gully Quarry, located at 243 & 395 Flagstaff Gully Road, Lindisfarne. The proposal involves a production increase from 262,500 m3 (420,000 tonnes) to 375,000 m3 (600,000 tonnes) of dolerite per year, and includes the crushing and screening of material. The proposal also includes an increase in the maximum receiving limit of waste concrete to be reprocessed (crushed and screened) onsite from 3,600 tonnes to 10,000 tonnes per year.

​Notice of Intent​

 Heidelberg Materials Australia Pty Ltd - Flagstaff Gully Quarry Production Increase, Lindisfarne - NOI (PDF 6Mb)​

Environmental Impact Statement Guidelines

EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Heidelberg Materials Australia Pty Ltd, Flagstaff Gully Quarry Production Increase, Lindisfarne - EIS Guidelines (PDF 752Kb)