Current Stage
Assessment Commenced
Proposal Details
Client: HIF Asia Pacific Pty Ltd
Premises: HIF Tasmania Carbon Neutral eFuel Plant
Activity: a chemical works
Class of Assessment: 2B
Important Dates
Assessment Commenced: 7/7/2022
The Proposal
The proposal is to develop a commercial scale chemical plant (using electrolysis and methanol synthesis processes) that will produce up 80,000 tonnes per annum (100 million litres) of efuel, using wood waste and forestry residue. This carbon neutral eFuel is stored in tanks and then loaded into tanker trucks for transport offsite.
Notice of Intent
HIF Asia Pacific Pty Ltd, HIF Tasmania Carbon Neutral eFuel Plant, Hampshire - NOI (PDF 8Mb)
Environmental Impact Statement Guidelines
EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
HIF Asia Pacific Pty Ltd, HIF Tasmania Carbon Neutral eFuel Plant, Hampshire - EIS Guidelines (PDF 351Kb)