Huon Aquaculture Company Pty Ltd, Lonnavale Broodstock RAS and Pre-Smolt Facility, Lonnavale

Current Stage

Public Comment Invited on Case for Assessment

Proposal Details

Client: Huon Aquaculture Company Pty Ltd

Premises: Lonnavale Broodstock RAS Facility

Activity: Finfish Farming

Class of Assessment: Not Applicable

Important Dates

Assessment Commenced: 5/8/2024

Case for Assessment Opened for Public Comment: 7/10/2026

Case for Assessment Closed for Public Comment: 5/11/2026

​​​The Proposal

The proposed project is for the development of the existing Lonnavale Hatchery Facility at 1374 Lonnavale Road, Lonnavale TAS 7109. It will involve:

a new recirculated aquaculture system (RAS) facility to house up to 110.25 tonnes of broodstock for egg production.

    • a new recirculated aquaculture system (RAS) facility to house up to 110.25 tonnes of broodstock for egg production.
    • the construction of two additional tanks to the existing pre-smolt 1 system capable of holding an additional 26.25 tonnes of biomass.
    • The installation of an ensiler to process mortalities from the facility.
    • the installation of a new shed to house new broodstock RAS tank arrays and associated elements.
    • the installation of a building over the existing pre-smolt system
    • replacement and upgrade of the existing sludge handling and treatment system
    • upgrade of the existing water offtake infrastructure
    • upgrade of the existing effluent treatment system, including the construction of a new settlement/storage dam
    • upgrade of the power supply and construction of a centralised service facility.

Assessment previously commenced for the proposal in August 2024, but an updated Notice of Intent was provided in September 2025 requiring revision of the Guidelines prepared by the Board.​


The proponent has lodged a Permit Application with a supporting Environmental Impact Statement (EIS) to Huon Valley Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).

Notice of Intent

 Huon Aquaculture Company Pty Ltd, Lonnavale Broodstock RAS Facility, Lonnavale - NOI (PDF 1Mb)

​Environmental Impact Statement Guidelines

EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.​​

 Huon Aquaculture Company Pty Ltd, Lonnavale Broodstock RAS Facility, Lonnavale - EIS Guidelines (PDF 605Kb)

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EIS) are available for public inspection and may be examined during normal business hours at:

Huon Valley Council
40 Main Street
HUONVILLE   TAS   7109

For assistance in accessing a copy of the EIS, please contact Huon Aquaculture at cselkirk@huonaqua.com.au .

Public Representations

In accordance with s.57(5) of the Land Use Planning and Approvals Act 1993 (LUPAA), any person may make a representation relating to the permit application (including the EIS) from Wednesday 07 October 2026 to Thursday 05 November 2026 in writing to:

The General Manager
Huone Valley Council
PO Box 210
HUONVILLE   TAS   7109​

or by emailing the General Manager at: hvc@huonvalley.tas.gov.au.

Please note that your correspondence may be publicly disclosed unless there is legitimate commercial, national security or environmental reason for confidentiality. If you would like your correspondence to remain confidential, please make a statement to that effect and indicate the basis for the request.

Environmental Impact Statement

The purpose of the EIS is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EIS was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EIS which were provided by the Board.

 Huon Aquaculture Company Pty Ltd, Lonnavale Broodstock RAS Facility, Lonnavale - EIS (PDF 68Mb)