Huon Aquaculture Group Pty Ltd, Parramatta Creek Fish Processing Facility, Increase in Production

Current Stage

Assessment Completed

Proposal Details

Client: Huon Aquaculture Group Pty Ltd

Premises: 7216 Bass Highway, Sassafras 7307

Activity: Fish processing factory

Class of Assessment: 2B

Important Dates

Assessment Commenced: 8/10/2015

Case for Assessment Opened for Public Comment: 29/2/2020

Case for Assessment Closed for Public Comment: 28/3/2020

Assessment Completed: 6/8/2020

The Proposal

Huon Aquaculture Group Pty Ltd has proposed an increase in production capacity at its Parramatta Creek fish processing facility located at 7216 Bass Highway in Sassafras. The proposal is to increase production from 12,000 tonnes to 33,000 tonnes per year of salmon products. The proposal includes a revised wastewater irrigation scheme with wastewater piped to an adjacent landholding in other ownership at 7218 Bass Highway Sassafras.

The proponent has lodged a Permit Application with a supporting Development Proposal and Environmental Management Plan (DPEMP) to Latrobe Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the DPEMP) were made available for public consultation. The public consultation period has now closed.

Development Proposal and Environmental Management Plan

The purpose of the DPEMP is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The DPEMP was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of a DPEMP which were provided by the Board.

 

  Huon Aquaculture Group Pty Ltd, Parramatta Creek Fish Processing Facility, Increase in Production - DPEMP   (12Mb)

  Huon Aquaculture Group Pty Ltd, Parramatta Creek Fish Processing Facility, Increase in Production - Appendices   (51Mb)

Environmental Assessment Report and EPA decision

The environmental assessment report has now been completed and can be viewed below. The report contains the permit conditions required by the Board to be included in the land use permit, if a permit is granted, by Council.

  Huon Aquaculture Group Pty Ltd, Parramatta Creek Fish Processing Facility, Increase in Production - EAR   (27Mb)​