Current Stage
Assessment Commenced
Proposal Details
Client: Hydro-Electric Corporation
Premises: Lake King William
Activity: materials handling
Class of Assessment: 2A
Important Dates
Assessment Commenced: 19/10/2022
The Proposal
The proposal relates to upgrade works for the
Tarraleah Power Scheme and has multiple aspects, including the construction of
an intake structure, including development of a temporary concrete batch plant;
several extraction sites, including underwater; blasting at several sites,
including underwater and underground for the tunnel; and crushing and screening
of up to 100,000 cubic meters of material. The proposal will be located around
the Clarke Dam area of Lake King William.
Notice of Intent
Hydro-Electric Corporation, Tarraleah Power Scheme Upgrade Works, Lake King William - NOI (PDF 4Mb)
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
Hydro-Electric Corporation, Tarraleah Power Scheme Upgrade Works, Lake King William - EER Guidelines (PDF 396Kb)