The Proposal
The 2/5 Dam Tailing Storage Facility Stage 3
embankment raise proposal is to increase the height of the 2/5 dam by 2 metres to
RL 175 metres. This will increase the storage capacity of the tailing’s facility
for approximately 18 months. The construction material for the raise will be
sourced from new borrow areas located within the mining lease.