Current Stage
Assessment Commenced
Proposal Details
Client: Mornington Park Development
Premises: Hydrowater Treatment Facility
Activity: Hydrowater Treatment Facility
Class of Assessment: 2A
Important Dates
Assessment Commenced: 16/12/2022
The Proposal
Mornington Park Development Pty Ltd proposes to
expand and upgrade the existing Hydrowater Treatment Facility at 126 Mornington
Park Road, Mornington to allow for receipt, storage, treatment and disposal of
up to 30,000 tonnes of material per year. The proposal includes the
establishment of a designated area for receipt, storage, treatment and disposal
of up to 10,000 tonnes per year of ‘project specific’ material which may
require special treatment or is known to contain Low Level Contaminated Soil
(classified as Level 2 under the EPA Information Bulletin No. 105 –
Classification and Management of Contaminated Soil for Disposal). The
‘project specific’ material includes material from the New Bridgewater Bridge
Project.