Mornington Park Development Pty Ltd, Expansion and Upgrade of Hydrowater Treatment Facility, Mornington

Current Stage

Assessment Commenced

Proposal Details

Client: Mornington Park Development

Premises: Hydrowater Treatment Facility

Activity: Hydrowater Treatment Facility

Class of Assessment: 2A

Important Dates

Assessment Commenced: 16/12/2022

​​​The Proposal

Mornington Park Development Pty Ltd proposes to expand and upgrade the existing Hydrowater Treatment Facility at 126 Mornington Park Road, Mornington to allow for receipt, storage, treatment and disposal of up to 30,000 tonnes of material per year. The proposal includes the establishment of a designated area for receipt, storage, treatment and disposal of up to 10,000 tonnes per year of ‘project specific’ material which may require special treatment or is known to contain Low Level Contaminated Soil (classified as Level 2 under the EPA Information Bulletin No. 105 – Classification and Management of Contaminated Soil for Disposal). The ‘project specific’ material includes material from the New Bridgewater Bridge Project.​​