Mornington Park Development Pty Ltd, Expansion and Upgrade of Hydrowater Treatment Facility, Mornington

Current Stage

Assessment Completed

Proposal Details

Client: Mornington Park Development

Premises: Hydrowater Treatment Facility

Activity: Hydrowater Treatment Facility

Class of Assessment: 2A

Important Dates

Assessment Commenced: 16/12/2022

Case for Assessment Opened for Public Comment: 7/5/2025

Case for Assessment Closed for Public Comment: 21/5/2025

Assessment Completed: 10/7/2025

​​​​​​The Proposal

Mornington Park Development Pty Ltd proposes to expand and upgrade the existing Hydrowater Treatment Facility at 126 Mornington Park Road, Mornington to allow for receipt, storage, treatment and disposal of up to 30,000 tonnes of material per year. The proposal includes the establishment of a designated area for receipt, storage, treatment and disposal of up to 10,000 tonnes per year of ‘project specific’ material which may require special treatment or is known to contain Low Level Contaminated Soil (classified as Level 2 under the EPA Information Bulletin No. 105 – Classification and Management of Contaminated Soil for Disposal). The ‘project specific’ material includes material from the New Bridgewater Bridge Project.​​

The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Clarence City Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).​

Development Application

This proposal was referred directly by Clarence City Council to the Board of the EPA on 12 December 2023 as a development application and therefore a Notice Of Intent (NOI) was not required.​​

Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Mornington Park Development Pty Ltd, Expansion and Upgrade of Hydrowater Treatment Facility, Mornington - EER Guidelines (PDF 460Kb)

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed.

Environmental Effects Report

The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.

 Mornington Park Development Pty Ltd, Expansion and Upgrade of Hydrowater Treatment Facility, Mornington - EER (PDF 31Mb)​

​​​Environmental Assessment Report and EPA Decision

The environmental assessment Report (EAR) has now been completed and can be viewed below. The report contains the permit conditions required by the ​Board to be included in the land use permit, if a permit is granted by council.

 Mornington Park Development - Upgrade and Expansion of Hydrovac and Soil Treatment Facility - EAR (PDF 2Mb)​