Current Stage
Assessment Commenced
Proposal Details
Client: Mornington Park Development
Premises: Hydrowater Treatment Facility
Activity: Hydrowater Treatment Facility
Class of Assessment: 2A
Important Dates
Assessment Commenced: 16/12/2022
The Proposal
Mornington Park Development Pty Ltd proposes to
expand and upgrade the existing Hydrowater Treatment Facility at 126 Mornington
Park Road, Mornington to allow for receipt, storage, treatment and disposal of
up to 30,000 tonnes of material per year. The proposal includes the
establishment of a designated area for receipt, storage, treatment and disposal
of up to 10,000 tonnes per year of ‘project specific’ material which may
require special treatment or is known to contain Low Level Contaminated Soil
(classified as Level 2 under the EPA Information Bulletin No. 105 –
Classification and Management of Contaminated Soil for Disposal). The
‘project specific’ material includes material from the New Bridgewater Bridge
Project.
Development Application
This proposal was referred
directly by Clarence City Council to the Board of the EPA on
12 December 2023 as a development application and therefore a Notice
Of Intent (NOI) was not required.
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
Mornington Park Development Pty Ltd, Expansion and Upgrade of Hydrowater Treatment Facility, Mornington - EER Guidelines (PDF 460Kb)