Paneltec Group, Hydrovac Waste Recovery Facility, Mowbray

Current Stage

Assessment Commenced

Proposal Details

Client: Paneltec Group

Premises: Hydrovac Waste Recovery Facility

Activity: Waste Treatment and Disposal – Waste Depots

Class of Assessment: 2B

Important Dates

Assessment Commenced: 29/11/2024

The Proposal

Paneltec Group have proposed to construct and operate a Hydrovac Waste Recycling Facility. The facility is planned to handle and process up to 25,000 tonnes per annum of waste generated through hydro-vacuum operations.


Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Paneltec Group, Hydrovac Waste Recycling Facility, Mowbray - EER Guidelines (PDF 390Kb)​