Current Stage
Assessment Commenced
Proposal Details
Client: Paneltec Group
Premises: Hydrovac Waste Recovery Facility
Activity: Waste Treatment and Disposal – Waste Depots
Class of Assessment: 2B
Important Dates
Assessment Commenced: 29/11/2024
The Proposal
Paneltec Group have proposed to construct and operate a Hydrovac Waste Recycling Facility. The facility is planned to handle and process up to 25,000 tonnes per annum of waste generated through hydro-vacuum operations.
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
Paneltec Group, Hydrovac Waste Recycling Facility, Mowbray - EER Guidelines (PDF 390Kb)