Reprocess Tas Pty Ltd, Inert Waste Depot, Risdon Vale

Current Stage

Assessment Completed

Proposal Details

Client: Reprocess Tas Pty Ltd

Premises: 20 and 42 Scotts Road, Risdon Vale 7016

Activity: Inert Waste Depot

Class of Assessment: 2B

Important Dates

Assessment Commenced: 25/6/2021

Assessment Completed: 3/11/2021

​​

Status: The proponent withdrew the proposal on 3/11/2021

​​​The Prop​​osal

Reprocess Tas Pty Ltd proposes to develop a waste processing facility to process construction and demolition waste materials, including 20,000 tonnes of concrete, 2,500 tonnes of non-dig material, 20,000 tonnes of sand and 250 tonnes of timber and green waste per annum. Other waste materials that will be processed include bricks, metal, plasterboard, asphalt, and soil.