Current Stage
Assessment Completed
Proposal Details
Client: Reprocess Tas Pty Ltd
Premises: 20 and 42 Scotts Road, Risdon Vale 7016
Activity: Inert Waste Depot
Class of Assessment: 2B
Important Dates
Assessment Commenced: 25/6/2021
Assessment Completed: 3/11/2021
Status: The proponent withdrew the proposal on 3/11/2021
The Proposal
Reprocess Tas Pty Ltd proposes to develop a waste processing facility to process construction and demolition waste materials, including 20,000 tonnes of concrete, 2,500 tonnes of non-dig material, 20,000 tonnes of sand and 250 tonnes of timber and green waste per annum. Other waste materials that will be processed include bricks, metal, plasterboard, asphalt, and soil.