Current Stage
Assessment Commenced
Proposal Details
Client: ReProcess Tas Pty Ltd
Premises: 42 Scotts Road, Risdon Vale
Activity: Waste Depot
Class of Assessment: 2B
Important Dates
Assessment Commenced: 31/10/2021
The Proposal
The proposal is for
the development of a facility at Risdon Vale to process a range of construction
and demolition waste materials, including up to 20,000 tonnes of concrete,
20,000 tonnes of sand, 250 tonnes of green waste and 2,500 tonnes of non-dig excavated
material per annum. The facility will also receive and treat up to 10,000
tonnes of contaminated solid and liquid waste per annum, including the receipt
and storage of hazardous waste for transport interstate.