Riverdale Dairies, Sykes Quarry Expansion, Springfield

Current Stage

Assessment Commenced

Proposal Details

Client: Riverdale Dairies Pty Ltd

Premises: Sykes Quarry

Activity: a quarry and materials handling facility

Class of Assessment: 2B

Important Dates

Assessment Commenced: 27/6/2025

​​​The Proposal 

The proposal is for the expansion of the maximum extraction area for an existing level 2 quarry and the upgrade and intensification of use of an existing access off Ten Mile Track. The existing extraction (20,000 m3) and processing volumes (18,000 m3) will remain unchanged.​

Development Application

This proposal was referred directly by Dorset Council to the Board of the EPA on 27 June 2025 as a development application (PLA No. 2025/53) and therefore a Notice of Intent (NOI) was not required. ​