Current Stage
Assessment Completed
Proposal Details
Client: Southern Midlands Council
Premises: Stonehenge Quarry
Activity: a quarry and materials handling
Class of Assessment: 2A
Important Dates
Assessment Commenced: 7/11/2024
Case for Assessment Opened for Public Comment: 15/1/2026
Case for Assessment Closed for Public Comment: 30/1/2026
Assessment Completed: 11/3/2026
The Proposal
Southern Midlands Council is proposing to intensify operations at the Stonehenge Quarry, located off Stonehenge and Swanston Roads, approximately 15 kilometres northeast of Tunnack. The proposal involves a production increase from 5,000 cubic metres (m³) to 20,000 m³ of weathered dolerite per year and includes the crushing and screening of material.
Stonehenge Quarry is a current level 1 quarry (mining lease: 1977 P/M), supplying materials to council and private projects throughout the municipality, with a current maximum annual extraction limit of 5,000 m³ and processing limit of 1,000 m³.
The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Soluthern Midlands Council.
The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).
Notice of Intent
Southern Midlands Council, Stonehenge Quarry Increase in Production, Tunnack - NOI (PDF 816Kb)
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
Southern Midlands Council, Stonehenge Quarry Increase in Production, Tunnack - EER Guidelines (PDF 424Kb)
Public Exhibition of Documentation
A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed.
Environmental Effects Report
The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.
The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.
Southern Midlands Council, Stonehenge Quarry Increase in Production, Tunnack - EER (PDF 31Mb)
Environmental Assessment Report and EPA Decision
The environmental assessment report (EAR) has now been completed and can be viewed below. The report contains the permit conditions required by the Board to be included in the land use permit, if a permit is granted, by Council.
Southern Midlands Council, Stonehenge Quarry Increase in Production, Tunnack - EAR (PDF 2Mb)