Southern Waste Solutions, Copping Interim Composting Project, Copping Landfill

Current Stage

Assessment Completed

Proposal Details

Client: Southern Waste Solutions

Premises: Copping Landfill

Activity: Resource recovery - the production of compost

Class of Assessment: 2A

Important Dates

Assessment Commenced: 25/6/2025

Case for Assessment Opened for Public Comment: 1/4/2026

Case for Assessment Closed for Public Comment: 21/4/2026

Assessment Completed: 2/6/2026

​​

​The Proposal

Southern Waste Solutions are proposing to establish a short term (approximately 3 years) composting facility. Fully located within the footprint of the existing Copping landfill site, up to 15,000 tonnes per annum of Council Food Organics and Garden Organics (FOGO) is proposed to be composted in open windrows. The facility will utilise the existing landfill leachate treatment system and the resultant compost will be utilised for the rehabilitation of the existing landfill. ​​

The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Sorell Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).​

Notice of Intent

 Southern Waste Solutions, Copping Landfill, Copping Interim Composting Project - NOI (PDF 783Kb)​


Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Southern Waste Solutions, Copping Interim Composting Project, Copping Landfill - EER Guidelines (PDF 390Kb)​

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed.​

Environmental Effects Report

The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.​

 Southern Waste Solutions, Copping Interim Composting Project, Copping Landfill - EER (PDF 10Mb)

Environmental Assessment Report and EPA Decision

The environmental assessment report (EAR) has now been completed and can be viewed below. The report contains the permit conditions required by the Board to be included in the land use permit, if a permit is granted, by Council.

 Southern Waste Solutions, Copping Interim Composting Project, Copping Landfill - EAR (PDF 3Mb)