Southern Waste Solutions, Copping Landfill, Stage 1B Expansion

Current Stage

Assessment Commenced

Proposal Details

Client: Southern Waste Solutions

Premises: Copping Landfill

Activity: waste depot

Class of Assessment: 2B

Important Dates

Assessment Commenced: 6/9/2023

​​​​​​​​​The Proposal

The proposal is for the intensification of operations at the Copping Landfill and comprises the filling of B-cells numbered 12 and 13 and the construction and filling of a new B-cell, number 14, located within the footprint of the existing Copping Stage 1B landfill area. The proponent, Southern Waste Solution is seeking approval for the permanent use of a BeneVap, a high temperature combustion vapouriser, to improve the management of landfill leachate, together with improvements to the stormwater management system. An increase to the volume of waste to be received at the Copping B-cells from 200,000 tonnes per year to 280,000 tonnes per year is proposed as part of this assessment.

The proponent intends to lodge a permit application with Sorell Council under the Land Use Planning and Approvals Act 1993. The proposal will be subject to an environmental impact assessment by the Board of the EPA (the Board) in accordance with the Environmental Management and Pollution Control Act 1994 (EMPC Act).​


Notice of Intent

 Southern Waste Solutions, Copping Landfill, Stage 1B Expansion - NOI (PDF 11Mb)


​Environmental Impact Statement Guidelines

​EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.​

 Southern Waste Solutions, Copping Landfill, Stage 1B Expansion - EIS Guidelines  (PDF 552Kb)​