Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works

Current Stage

Public Comment Closed on Case for Assessment

Proposal Details

Client: Southern Waste Solutions

Premises: Lutana Waste Transfer Station

Activity: a materials handling facility and waste depot

Class of Assessment:

Important Dates

Assessment Commenced: 15/11/2024

Case for Assessment Opened for Public Comment: 13/3/2026

Case for Assessment Closed for Public Comment: 13/4/2026

The Proposal

Southern Waste Solutions is proposing to change the use of the Lutana Waste Transfer Station to allow for resource recovery works on up to 90,000 tonnes of waste per year on the existing site. The recovery works would operate in parallel with the existing waste transfer station. Waste will be separated and processed into product streams for reuse where possible.​​

The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Glenorchy City Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).

Notice of Intent 

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - NOI (PDF 2Mb)

Environmental Effects Report Guidelines 

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - EER Guidelines (PDF 354Kb)​

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed.​

Environmental Effects Report

The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - EER (PDF 13Mb)

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - Appendix A (PDF 9Mb)

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - Appendix B (PDF 4Mb)

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - Appendix C (PDF 15Mb)

 Southern Waste Solutions, Lutana Waste Transfer Station, Lutana Resource Recovery Works - Appendix D (PDF 280Kb)