Current Stage
Assessment Commenced
Proposal Details
Client: TasWater
Premises: Bicheno Wastewater Treatment Plant
Activity: Wastewater treatment works
Class of Assessment: 2B
Important Dates
Assessment Commenced: 8/7/2022
Status: Final
Guidelines issued, awaiting EIS
The Proposal
The
proposal is to continue to operate the existing Bicheno Sewage Treatment Plant
and existing effluent recycled water scheme at the Bicheno Golf Club, and to
expand the wastewater reuse scheme to other nearby properties, with the aim of
significantly reducing discharges to the Old Mines Lagoons.
Notice of Intent
TasWater , Bicheno Wastewater Treatment Plant and Recycled Water Scheme Expansion Project - NOI (PDF 9Mb)
Environmental Impact Statement Guidelines
EIS Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
TasWater, Bicheno Wastewater Treatment Plant and Recycled Water Scheme Expansion Project - EIS Guidelines (PDF 2Mb)