Current Stage
Assessment Commenced
Proposal Details
Client: Walters Contracting Pty Ltd
Premises: Porters Bridge Quarry
Activity: a quarry and materials handling
Class of Assessment: 2B
Important Dates
Assessment Commenced: 15/7/2024
The Proposal
The proposal involves intensification and expansion of the existing Porters Bridge Road Quarry located at 190 Porters Bridge Road, Exton. The Quarry currently employs rip and push and drilling and blasting techniques to extract aggregate. The proposal is to increase processing and extraction limits from 32 000 to 200 000 cubic metres per annum. The active quarry zone would expand to approximately 10.5 hectares, with an additional expansion of the existing stockpiling and loading area to 3.1 hectares. Auxiliary infrastructure will also be required and includes stormwater infrastructure, office and toilet, workshop, diesel fuel tank, weighbridge and diesel-powered generator.
Project Description
Walters Contracting Pty Ltd, Porters Bridge Quarry Intensification, 190 Porters Bridge Road - Project Description (PDF 12Mb)