White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase

Current Stage

Public Comment Closed on Case for Assessment

Proposal Details

Client: White Beach Civil Solutions Pty Ltd

Premises: White Beach Quarry

Activity: a quarry and materials handling

Class of Assessment: 2B

Important Dates

Assessment Commenced: 25/2/2023

Case for Assessment Opened for Public Comment: 20/4/2024

Case for Assessment Closed for Public Comment: 20/5/2024

​​​The Proposal

White Beach Civil Solutions Pty Ltd is seeking approval to increase the maximum annual production capacity of the existing White Beach Quarry to 30,000 cubic metres of processed product. The quarry currently extracts dolerite and basalt deposits onsite which are then processed into gravels for landscaping, shoulders and paths and ‘select fill’ for underlying road pavements. ​​

The proponent has lodged a Permit Application with a supporting Environmental Effects Report (EER) to Tasman Council.

The application was referred to the Board of the Environment Protection Authority (the Board) for assessment under the Environmental Management and Pollution Control Act 1994 (EMPCA).​

​​Notice of Intent

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - NOI (PDF 2Mb)​

Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Guidelines (PDF 1Mb)

Public Exhibition of Documentation

A copy of the permit application and all plans and other documentation submitted with the permit application (including the EER) were made available for public inspection. The public consultation period has now closed. 

​Environmental Effects Report

The purpose of the EER is to provide a source of information upon which interested individuals, groups, government agencies and the Board may consider the environmental impacts of the proposal.

The EER was prepared by the proponent on the basis of the Project Specific Guidelines for preparation of an EER which were provided by the Board.​

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER (PDF 6Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 1 (PDF 162Kb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 2 (PDF 5Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 3 (PDF 2Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 4 (PDF 2Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 5 (PDF 933Kb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 6 (PDF 10Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 6 - A (PDF 4Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 6 - B (PDF 2Mb)

 White Beach Civil Solutions Pty Ltd, White Beach Quarry Capacity Increase - EER Appendix 6 - C (PDF 94Kb)