The Board of the EPA has completed its assessment of a proposal by MMG Australia Ltd to modify operations at the 2/5 Dam Tailings Storage Facility (TSF) at Rosebery and implement a dry closure system to support the facility's long-term rehabilitation.
The proposal involves a transition from subaqueous tailings deposition (under water) to permanent subaerial deposition (above water), together with the development of two borrow areas to source materials required for long-term rehabilitation and closure of the facility. The change will increase the storage capacity of the TSF and support the continued operation of the Rosebery Mine while also enabling final rehabilitation of the site through the establishment of a covered and vegetated landform.
As part of the assessment process, the Environmental Impact Statement was publicly exhibited for 37 days. No public submissions were received.
The EPA's assessment focused on potential risks associated with dust and air emissions, water quality, acid and metalliferous drainage, and impacts on natural values. Following detailed assessment, the EPA Board determined that these risks can be appropriately managed through a comprehensive suite of over 60 conditions.
A key focus of the conditions is the management of air quality and dust emissions. MMG will be required to maintain and implement an updated Dust Mitigation Plan, continue dust suppression measures on exposed tailings surfaces, expand dust monitoring within the Rosebery community, and undertake regular monitoring of dust deposition, airborne particles and associated metals. The conditions also establish reporting, investigation and corrective action requirements if monitoring identifies elevated dust levels.
The conditions further require ongoing management of surface water, groundwater and seepage to minimise the risk of environmental impacts, together with monitoring and investigation programs to detect and respond to any emerging issues.
To support long-term rehabilitation outcomes, MMG must construct an engineered cover system over the TSF and implement closure measures designed to reduce water infiltration, minimise the potential for acid and metalliferous drainage, and establish a stable vegetated landform. Additional conditions require the protection of threatened species such as the Tasmanian Masked Owl and Tasmanian Devil along with native vegetation protection during borrow area development and rehabilitation activities.
The EPA undertook the assessment of the proposal in accordance with the Environmental Impact Assessment Principles in Section 74 of the Environmental Management and Pollution Control Act 1994.
This decision and all assessment documents can be viewed on the EPA website at MMG Australia Limited, 2/5 Dam Tailings Storage Facility, Stage 2 Subaerial Deposition and Closure, Rosebery.