• EPA Tasmania
  • Assesment
  • Regulation & Assessment
  • Sustainability
  • Policy & Legislation

Lagoon Design and Management

​The guideline on the Design and Management of Tasmanian Lagoon Systems, 1996 is a comprehensive guide for designing and maintaining sewage lagoon systems.

  Lagoon Design and Management Guidelines 1996   (4Mb)

The guidelines discuss PONDCAL, a program developed to help design lagoons for temperate areas of Australia.

  PONDCAL   (42Kb)

There are also guidelines specifically for lagoon liners. Lagoon liners ​must be properly constructed to comply with clause 24 of the State Policy on Water Quality Management 1997, which requires safeguards to be put in place to minimise risks of groundwater contamination.

  Environmental Standards Applying to Liner Construction March 2006   (32Kb)


 

Wastewater Management Section
134 Macquarie Street
Hobart TAS 7000
Phone: 03 6165 4599
Email: Enquiries@epa.tas.gov.au