Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield

Current Stage

Assessment Commenced

Proposal Details

Client: Boral Construction Materials Group Pty Ltd

Premises: Flowery Gully Quarry

Activity: a quarry and materials handling

Class of Assessment: 2B

Important Dates

Assessment Commenced: 12/1/2024

The Proposal

Boral Construction Materials Group Ltd is proposing to expand the existing Flowery Gully Quarry at Flowery Gully Road, Beaconsfield.  The proposal is to expand the maximum quarry area laterally, and vertically south of the existing quarry area.  There are no proposed changes to the extraction and processing limit of 190,000 cubic metres per annum.   ​

Notice of Intent

 Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - NOI (PDF 201Kb)

 Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - NOI Attachment 1 (PDF 2Mb)

 Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - NOI Attachment 2 (PDF 235Kb)

Environmental Effects Report Guidelines

EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.

 Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - EER Guidelines (PDF 294Kb)