Current Stage
Assessment Commenced
Proposal Details
Client: Boral Construction Materials Group Pty Ltd
Premises: Flowery Gully Quarry
Activity: a quarry and materials handling
Class of Assessment: 2B
Important Dates
Assessment Commenced: 12/1/2024
The Proposal
Boral Construction Materials Group Ltd is proposing to expand the
existing Flowery Gully Quarry at Flowery Gully Road, Beaconsfield. The
proposal is to expand the maximum quarry area laterally, and vertically south
of the existing quarry area. There are no proposed changes to the
extraction and processing limit of 190,000 cubic metres per annum.
Notice of Intent
Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - NOI (PDF 201Kb)
Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - NOI Attachment 1 (PDF 2Mb)
Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - NOI Attachment 2 (PDF 235Kb)
Environmental Effects Report Guidelines
EER Guidelines have been prepared by the Board to assist the proponent to prepare a case for assessment. Based on the information contained in the Notice of Intent, the guidelines identify the key issues which are expected to be relevant to the assessment of the proposal.
Boral Construction Materials Group Pty Ltd, Flowery Gully Quarry Development Project, Flowery Gully Road, Beaconsfield - EER Guidelines (PDF 294Kb)