Downer EDI Asphalt Plant, Mowbray

Current Stage

Assessment Commenced

Proposal Details

Client: Downer EDI Works Pty Ltd

Premises: Asphalt Plant, 59 Remount Road, Mowbray 7248

Activity: Asphalt Plant

Class of Assessment: 2B

Important Dates

Assessment Commenced: 18/5/2021

​​The Proposal​

The proposed asphalt plant will replace an existing Downer EDI facility on a different site, which will be decommissioned. The plant will enable the incorporation of recycled plastics, glass, flyash, rubber and recycled asphalt material as well as bitumen and crushed rock to a maximum of 50,000 tonnes per annum.​