Current Stage
Assessment Commenced
Proposal Details
Client: Hazell Bros Group Pty Ltd
Premises: 59 Raeburn Road, Breadalbane
Activity: Concrete batching plant - Called in Level 1 activity under Section 24(1) of EMPCA
Class of Assessment: 2B
Important Dates
Assessment Commenced: 12/10/2021
Page Content
The Proposal
Hazell Bros Group Pty Ltd has proposed extended operating hours and an increase in production at an existing concrete batch plant at 59 Raeburn Road, Breadalbane. A change of operating hours to include the period 0500 to 0600 hrs and
an increase in production from 27,000 cubic metres to 40,000 to 45,000 cubic metres per annum is proposed.